Maintaining GMP-compliant cleanrooms is a cornerstone of pharmaceutical manufacturing. With increasing scrutiny from regulators and evolving industry standards, cleanroom design, operation, and monitoring must meet the stringent expectations set out by ISPE and PIC/S. This article outlines essential cleanroom requirements and highlights recent guidance and trends for 2025.
What Are the Current Cleanroom Requirements?
Cleanrooms are controlled environments designed to minimize contamination risks. The critical elements include:
1. Environmental Control
- HVAC systems must ensure proper pressure differentials, temperature, humidity, and particulate control.
- Air changes per hour (ACPH) must be appropriate for the cleanroom classification (ISO or EU GMP Grade).
- HEPA filters (typically 99.97% at 0.3 μm) are mandatory for Grade B and above areas.
2. Cleanroom Classification
According to PIC/S PE 009-17 Annex 1 and ISO 14644-1:
- Grade A: For high-risk operations like aseptic filling
- Grade B: Background for Grade A operations
- Grade C/D: Less critical, for supporting tasks
3. Facility and Layout Design
- Unidirectional flow of personnel, materials, and waste
- Airlocks (personnel and material) for contamination control
- Smooth, flush, non-shedding surfaces with no ledges or gaps
4. Personnel Gowning and Flow
- Proper gowning sequence is critical. Access should be restricted and controlled with documented training.
- ISPE Baseline Guide Volume 5 emphasizes "people as the greatest contamination source."
Monitoring & Qualification Expectations
Both ISPE and PIC/S highlight the importance of ongoing monitoring:
📍 Routine Monitoring:
- Non-viable particle monitoring (ISO 14644-2)
- Viable monitoring via settle plates, contact plates, and active air sampling
- Differential pressure and temperature logs
Qualification Requirements:
- IQ/OQ/PQ must include cleanroom classification, air visualization (smoke studies), and filter integrity testing.
- Requalification is typically required annually or after major changes.
Key Differences and Recent Updates:
Aspect | Previous (Old Annex 1) | Current (Annex 1 v17 / PIC/S / ISPE) |
---|---|---|
RABS/Isolator Use | Not mandatory | Strongly encouraged for sterility assurance |
Contamination Control Strategy (CCS) | Not clearly defined | Must be risk-based and documented |
Continuous Monitoring | Periodic OK | Continuous viable/non-viable now emphasized |
Environmental Limits | Based on classification only | Includes alert/action levels, trending, and response protocols |
Expert Tip:
Always integrate ISPE Good Practice Guides with PIC/S Annex 1 to ensure a risk-based and science-driven approach. Use CCS, QRM, and data integrity principles in all stages of cleanroom lifecycle — from design to decommissioning.
Conclusion
The expectations around cleanroom standards are clearer and stricter than ever. By aligning with ISPE and PIC/S guidance, pharmaceutical companies can ensure both compliance and operational excellence. Investing in proper design, validated processes, and robust monitoring protects patient safety and your licence to operate.
Need help with cleanroom design, HVAC qualification, or Annex 1 gap assessments?
📩 Contact us today — Our GMP experts are ready to support your compliance journey.